Corridor Improvement Program (CIP)

Home » Resources » Corridor Improvement Program (CIP) Print Page
AGENDA for Workshop #2 – CIP: Phase I Assessment of US 1 /SR 5
AGENDA for Workshop #1 – CIP: Phase I Assessment of US 1 /SR 5 (South Section) – Dec 15_2011
AGENDA for Workshop #1 – CIP: Phase I Assessment of US 1 /SR 5 (North Section) – Dec 15_2011
Summary of Documents – US 1 CIP Phase I (as of  Dec 15_2011)


REFERENCE:

Executed Scope CIP Phase I US 1

Local Comprehensive Plans and Studies:
Daytona Beach Comp Plan
N_Ridgewood Overlay (Daytona Beach)
Daytona Beach Shores Comp Plan
Edgewater Comprehensive Plan
Edgewater Concurrency Report (2008)
Holly Hill Comprehensive Plan(September 2010)
Holly Hill -CRA Master Plan (Oct 2007)
New Smyrna Beach -Comprehensive Plan (2011)
New Smyrna Beach-CRA Master Plan Update (2010)

Ormond Bch Downtown Design Guidelines
Ormond Bch – CRA Master Plan Update
Ormond Bch Downtown Distrct Overlay
Ormond Bch Comp Plan (2025)
Ormond Bch DOD Dist. Regulating Plan
Port Orange Comp Plan – Trans. Mobility Element
South Daytona CRA Master Plan (June 2008)
South Daytona CRA Report (March2011)
Volusia County Comp Plan -Chapter 2 Transportation Element

OTHER STUDIES:
Adopted MPO Bike-Ped Plan (1-25-05)
Bike_Ped Feasibility -ClydeMorrisBlvd Trail Report (August 1, 2008)
City of Daytona Beach Area Wide Traffic Study (Jan. 2008)
City of Edgewater Dirt Road Reduction Plan (June 27,2008)
Countywide Emergency Vehicle Preemption Study REPORT (8-10-09)
Daytona Airport Connector FDOT-Strategic Intermodal System Highway Connectors Assessment
Daytona Greyhound Connector FDOT-Strategic Intermodal System Highway Connectors Assessment
ECFRPC Hurricane Evacuation Study - Transportation Analysis (1999)
Guidance on Corridor Planning for NEPA (4-05-11)
LPGA Blvd. Extension PD&E Study(June 2006)
LPGA Boulevard Extension-PSR (Jan 2006)
Ped Crosswalk Research Study-CRA1A & Atlantic Ave.(Feb 2010)
SR421-I95 Interchange Analysis (Jan 2009)
SR 483 Preliminary Engineering Report (August 2006)
SR 483 PD&E Project Traffic Existing & Future Conditions (August 2005)
SR 5 (US1)  – AIS Final (June 1999)
Traffic Signal System Upgrade Report (August 2010)
Transportation Feasibility Study SR 40 (August 2008)
VOTRAN Transit Development Design Guidelines (Adopted 02-26-08)
VTPO – Elderly Transportation Study (Nov. 2006)
VTPO - Transit Corridor Feasibility Analysis Study (March 2009)